SEPI was contracted by FLS Energy to provide an existing conditions and topographical survey for preliminary engineering purposes, construction stakeout and an as-built survey for a seven acre solar thermal farm in St. Paul’s, North Carolina. The entire project (2100 solar panels) had to be completely designed and permitted and the first two phases (1400 panels) constructed …
Project Type: Surveying
Feb
20
Aug
05
Charlotte Streetcar, Charlotte, NC
SEPI is providing surveying for the 10 mile corridor of the Streetcar project utilizing GPS to set horizontal and vertical control points and conventional Total Station surveying equipment to collect the existing road and visible infrastructure features that is to be included in the AutoCAD mapping of the project. Mecklenburg County GIS information was used …
This post has no tag
May
25
Rockingham-West End 230kv
East Line, Moore, Montgomery and Richmond Counties, North Carolina SEPI provided profile, x-sections, and property ties for a Rockingham-West end 230kv transmission line, 34 mile route survey from the West End 230 kv substation to the Rockingham 230kv substation. The survey scope consists of collecting both horizontal and vertical field data along approximately 181,500 linear …
This post has no tag

