Projects & Case Studies

Water Resources

NCDOT, Division 8 Low Impact Bridge Replacements

Chatham, Montgomery, Randolph, and Richmond Counties, NC

Services Utilized

Environmental Planning and Permitting
Traffic Engineering and Operations
Water Resources
Roadway Design
Site/Civil Engineering
Surveying

Project Summary

NCDOT, Division 8 Low Impact Bridge Replacements

Chatham, Montgomery, Randolph, and Richmond Counties, NC

SEPI was selected by Division 8 over the last four years to replace several aging bridges with new structures of various types, including cast-in-place reinforced concrete box culverts, three-sided crownspan culverts, corrugated aluminum alloy box culverts, and various bridge structures selected based upon site specific conditions. Many of the projects were located within FEMA Detail and Limited Detail Study Areas and required the completion of MOAs (Memorandum of Agreement between NCDOT and NCFMP). SEPI scope of services also included utility coordination and the development of Utility By Others (UBO) plans. Projects included:

  • BD-5108AA, Bridge 13, Richmond County, NC
  • B-5758, Bridge 13, Moore County, NC
  • 17BP.8.R.63, Bridge 36, Montgomery County, NC
  • BD-5108X, Bridge 55, Montgomery County, NC
  • BD-5108AB, Bridge 60, Richmond County, NC
  • 17BP.8.R.66, Bridge 61, Chatham County, NC
  • B-5760, Bridge 79, Richmond County, NC
  • BP.8.R.79, Bridge 84, Randolph County, NC
  • B-5763, Bridge 129, Randolph County, NC
  • B-5747, Bridge 157, Chatham County, NC
  • BD-5108Y, Bridge 162, Moore County, NC
  • B-5739, Bridge 170, Randolph County, NC
  • BD-5108W, Bridge 183, Moore County, NC
  • 17BP.8.R.65, Bridge 282, Chatham County, NC
  • BD-5108AD, Bridge 287, Chatham County, NC
  • 17BP.8.R.61, Bridge 439, Randolph County, NC
  • 17BP.8.R.60, Bridge 440, Randolph County, NC
65Projects
by Industry
by Service